Fuel Terminal Fire Protection System Upgrade

DIALOG Fitzroy have recently completed the fabrication, installation and commissioning of a new fire water system for our storage terminal client in Bluff NZ.  Our scope of work included:

  • Fabrication and installation of all pipe and fittings
  • Supply and installation of equipment, valves, monitors, hydrant connections, tank cooling rings
  • Pipe supports and structural steel access platforms
  • Placement and lifting of firewater pump containers
  • Inspection, testing and quality assurance 
  • Commission of piping and all relevant works

DIALOG Fitzroy Solution

This project required careful coordination to ensure there was no disruption to regular terminal operations.  Our experience of similar successful work for the same client at another terminal was extremely valuable and allowed us to plan and develop our workpacks with certainty.  This as been a great job and on the strength of our work on this scope we have been awarded further and following work on the same site

 